Please use this identifier to cite or link to this item:
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37191
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.creator.ID | GALINDO, L. F. M. | pt_BR |
dc.creator.Lattes | http://lattes.cnpq.br/7276983053325255 | pt_BR |
dc.contributor.advisor1 | BRAGA FILHO, Edgar Roosevelt. | |
dc.contributor.advisor1ID | BRAGA FILHO, E. R. | pt_BR |
dc.contributor.advisor1Lattes | http://lattes.cnpq.br/5260464346220327 | pt_BR |
dc.contributor.referee1 | SILVA, Célio Anésio da. | |
dc.contributor.referee1ID | SILVA, C. A. | pt_BR |
dc.contributor.referee1Lattes | http://lattes.cnpq.br/6105337488345986 | pt_BR |
dc.description.resumo | Neste relatório descrevem-se as principais atividades do período de Estágio Integrado em Engenharia Elétrica de Luan Fábio Marinho Galindo, na empresa ECOMAN – Engenharia, Construção e Manutenção LTDA, pelo setor de Construção e Manutenção de Linhas de Transmissão, atuando na obra LD 138 kV Alto Fêmeas II – Mundo Verde (Lote 1), solicitada pela Companhia de Eletricidade do Estado da Bahia (COELBA) na cidade de São Desidério, Bahia, com carga horária total de 669h. O texto aborda as ati-vidades realizadas pelo estagiário, partindo da fundamentação em normas no setor de construção de linhas de transmissão até o acompanhamento de atividades tanto em cam-po quanto no escritório que incluem, mas não se limitam a: locação de estruturas, esca-vação, concretagem, aterramento, pré-montagem, içamento, lançamento de condutores e grampeamento dos cabos, finalizando com indagações sobre a experiência de estágio, sobre como a formação na UFCG contribuiu para o estágio e com conclusões técnicas sobre a obra. O estágio ocorreu sob supervisão dos engenheiros Jorge Luiz Batista Leal e Hericles Rodrigues Ferreira e sob orientação do professor Edgar Roosevelt Braga Filho, D. Sc. | pt_BR |
dc.publisher.country | Brasil | pt_BR |
dc.publisher.department | Centro de Engenharia Elétrica e Informática - CEEI | pt_BR |
dc.publisher.initials | UFCG | pt_BR |
dc.subject.cnpq | Engenharia Elétrica | pt_BR |
dc.title | Relatório de Estágio Integrado: ECOMAN – Engenharia, Construção e Manutenção LTDA. | pt_BR |
dc.date.issued | 2024-06-05 | |
dc.description.abstract | This report describes the main activities of the Integrated Internship period of Luan Fá-bio Marinho Galindo, at the company ECOMAN – Engenharia, Construção e Manuten-ção LTDA, in the Construction and Maintenance of Transmission Lines sector, working on the LD 138 kV Alto Fêmeas II – Mundo project Verde (Lot 1), requested by the Electricity Company of the State of Bahia (COELBA) in the city of São Desidério, Bahia, with a total workload of 669h. The text addresses the activities carried out by the intern, starting from the basis of standards in the transmission line construction sector to monitoring activities both in the field and in the office which include, but are not limited to: tenantry of structures,excavation, concreting, grounding, pre-assembly, lifting, laying of conductors and clamping of cables, ending with inquiries about the internship experience, how graduating at UFCG contributed to the internship and with technical conclusions about the work. The internship took place under the supervision of engineers Jorge Luiz Batista Leal and Hericles Rodrigues Ferreira and under the guidance of Professor Edgar Roosevelt Braga Filho, D. Sc. | pt_BR |
dc.identifier.uri | http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/37191 | |
dc.date.accessioned | 2024-08-08T16:19:55Z | |
dc.date.available | 2024-08-08 | |
dc.date.available | 2024-08-08T16:19:55Z | |
dc.type | Trabalho de Conclusão de Curso | pt_BR |
dc.subject | ECOMAN | pt_BR |
dc.subject | COELBA | pt_BR |
dc.subject | Construção de Linhas de Transmissão | pt_BR |
dc.subject | Engenharia Elétrica | pt_BR |
dc.subject | Transmission Line Construction | pt_BR |
dc.subject | Electrical Engineering | pt_BR |
dc.rights | Acesso Aberto | pt_BR |
dc.creator | GALINDO, Luan Fábio Marinho. | |
dc.publisher | Universidade Federal de Campina Grande | pt_BR |
dc.language | por | pt_BR |
dc.title.alternative | Integrated Internship Report: ECOMAN – Engineering, Construction and Maintenance LTDA. | pt_BR |
dc.identifier.citation | GALINDO, Luan Fábio Marinho. Relatório de Estágio Integrado: ECOMAN – Engenharia, Construção E Manutenção LTDA. 58 f. Relatório de Estágio (Bacharelado em Engenharia Elétrica) - Universidade Federal de Campina Grande, Centro de Engenharia Elétrica e Informática, Campina Grande, Paraí-ba, Brasil, 2024. Disponível em: | pt_BR |
Appears in Collections: | Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
LUAN FÁBIO MARINHO GALINDO-RELATÓRIO DE ESTÁGIO-CEEI-ENGENHARIA ELÉTRICA (2024).pdf | 3.65 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.