Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23966
Full metadata record
DC FieldValueLanguage
dc.creator.IDARAÚJO, W. T.pt_BR
dc.creator.Latteshttp://lattes.cnpq.br/3902491246933236pt_BR
dc.contributor.advisor1FERNANDES, Macel Wallace Queiroz.-
dc.contributor.advisor1IDFERNANDES, M. W. Q.pt_BR
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/4214801635506443pt_BR
dc.contributor.referee1SOUZA, Ádney José Duarte de.-
dc.contributor.referee1IDSOUZA, A. J. D.pt_BR
dc.contributor.referee1Latteshttp://lattes.cnpq.br/9737013758835206pt_BR
dc.contributor.referee2SIMPLÍCIO, Marcos Antônio de Souza.-
dc.contributor.referee2IDSIMPLÍCIO, M. A.S.pt_BR
dc.contributor.referee2Latteshttp://lattes.cnpq.br/5090248192860158pt_BR
dc.description.resumoO processo de orçamentação de obras empregado por pequenas e médias empresas normalmente utilizam, em suas composições de custos, índices de consumo retirado das Tabelas de Composição de Preços para Orçamentos (TCPO) da Editora PINI. Tais índices geralmente são baseadas nas características das empresas construtoras que atuam nas regiões sul e sudeste, bem como nos recursos naturais disponíveis nestas regiões, não abrangendo, as técnicas construtivas e a disponibilidade de mão de obra, material e equipamentos de outras regiões. Nesse cenário, tendem a surgir diferenças entre os custos orçados e o efetivo consumo no canteiro de obras, em orçamentos elaborados nas demais regiões do país. Este trabalho objetiva apresentar uma análise da produtividade da mão de obra no serviço de armação em lajes, vigas e pilares de concreto armado, fazendo uma comparação dos índices de mão de obra coletados em obras da cidade de Campina Grande – PB, com os previstos na TCPO 14. Para o estudo foram escolhidas duas obras, na fase de superestrutura, onde foram coletados dados do serviço executado e das horas trabalhadas, sendo assim possível calcular a produtividade e realizar uma análise de custos de mão de obra. De posse dos valores de campo, foi realizada uma comparação com as composições de custos presentes no TCPO 14 para o serviço de armação. Os resultados dessa análise específica indicam que o serviço executado na obra possui uma produtividade bem superior aos indicados na TCPO 14. Concluiu-se, a partir disto, que as empresas estudadas não estão tendo prejuízos com a mão de obra nesses serviços. Porém, se houver um investimento maior na medição da produtividade no canteiro de obras, é possível obter dados, que retratem mais fielmente a realidade da obra e da empresa, a partir de índices de mão de obra próprios, já que foi observada grande variação em relação ao TCPO 14.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentCentro de Tecnologia e Recursos Naturais - CTRNpt_BR
dc.publisher.initialsUFCGpt_BR
dc.subject.cnpqEngenharia Civilpt_BR
dc.titleAnálise dos índices de produtividade de mão de obra no serviço de armação em estruturas de concreto armado - lajes, vigas e pilares.pt_BR
dc.date.issued2017-08-25-
dc.description.abstractThe budgeting process used by small and mediumsized construction companies usually uses consumption indexes drawn from the Table of Price Compositions for Budgets (TCPO, by the abbreviation in Portuguese) in their cost compositions. These indexes are generally based on the characteristics of the construction companies operating in the South and Southeast regions of Brazil, as well as, on the natural resources available in these regions not covering construction techniques and the availability of labor, material and equipment from other regions. In this scenario, differences between the budgeted costs and the actual consumption at the construction site tend to appear in budgets elaborated in the other regions of the country. This research aims to present an analysis of labor productivity in the framework service in slabs, beams and pillars made of reinforced concrete comparing labor indexes collected in constructions at the city of Campina Grande PB, with those foreseen in TCPO 14. For the study, two constructions in the superstructure phase were chosen, then data about performed service and worked hours were collected making it possible to calculate the productivity and perform an analysis of labor costs. With field values, a comparison was made with the cost compositions present in TCPO 14 for the framework service. The results of this specific analysis indicate that the service performed at the construction site has a well superior productivity than those indicated in TCPO 14. It was concluded from this, that the companies studied are not suffering from labor losses in these services. However, if there is a greater investment in the measurement of productivity at the construction site, it is possible to obtain data, which more accurately portrays the reality of the work and the company, based on the indices of own labor, since a great variation was observed in relation to TCPO 14.pt_BR
dc.identifier.urihttp://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23966-
dc.date.accessioned2022-03-21T17:46:46Z-
dc.date.available2022-03-21-
dc.date.available2022-03-21T17:46:46Z-
dc.typeTrabalho de Conclusão de Cursopt_BR
dc.subjectConstrução Civilpt_BR
dc.subjectConstructionpt_BR
dc.subjectConcreto armadopt_BR
dc.subjectReinforced concretept_BR
dc.subjectArmação em estruturas de concretopt_BR
dc.subjectReinforcement in concrete structurespt_BR
dc.subjectEstruturas de concreto armadopt_BR
dc.subjectReinforced concrete structurespt_BR
dc.subjectÍndices de produtividadept_BR
dc.subjectProductivity indicespt_BR
dc.subjectMão de obra - armação de concretopt_BR
dc.subjectLabor - concrete framept_BR
dc.subjectOrçamento de obraspt_BR
dc.subjectWorks budgetpt_BR
dc.subjectCusto de mão de obrapt_BR
dc.subjectLabor costpt_BR
dc.subjectComposição de custospt_BR
dc.subjectComposition of costspt_BR
dc.subjectProdutividade na Construção Civilpt_BR
dc.subjectProductivity in Civil Constructionpt_BR
dc.subjectLajespt_BR
dc.subjectSlabspt_BR
dc.subjectVigaspt_BR
dc.subjectBeamspt_BR
dc.subjectPilarespt_BR
dc.subjectPillarspt_BR
dc.rightsAcesso Abertopt_BR
dc.creatorARAÚJO, Werlley Targino de.-
dc.publisherUniversidade Federal de Campina Grandept_BR
dc.languageporpt_BR
dc.title.alternativeAnalysis of labor productivity rates in the service of reinforcement in reinforced concrete structures - slabs, beams and pillars.pt_BR
dc.identifier.citationARAÚJO, Werlley Targino de. Análise dos índices de produtividade de mão de obra no serviço de armação em estruturas de concreto armado - lajes, vigas e pilares. Trabalho de Conclusão de Curso (Monografia), Curso de Bacharelado em Engenharia Civil, Centro de Tecnologia e Recursos Naturais, Universidade Federal de Campina Grande - Campina Grande - Paraíba - Brasil, 2017. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/23966pt_BR
Appears in Collections:Curso de Bacharelado em Engenharia Civil - CTRN - Monografias

Files in This Item:
File Description SizeFormat 
WERLLEY TARGINO DE ARAÚJO - TCC ENG. CIVIL CTRN 2017.pdfWerlley Targino de Araújo - TCC Eng. Civil CTRN 2017.2.62 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.