Please use this identifier to cite or link to this item: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20916
Full metadata record
DC FieldValueLanguage
dc.creator.IDAMORIM FILHO, C. R. C.pt_BR
dc.creator.Latteshttp://lattes.cnpq.br/2894301106425854pt_BR
dc.contributor.advisor1LIRA, George Rossany Soares de.
dc.contributor.advisor1IDLIRA, G. R. S.pt_BR
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/7283717300126094pt_BR
dc.contributor.referee1QUEIROZ, Wamberto José Lira de.
dc.contributor.referee1IDQUEIROZ, W. J. L.pt_BR
dc.description.resumoEste relatório é referente ao estágio integrado realizado pelo aluno Cícero Rômulo Campos de Amorim Filho, na empresa Acumuladores Moura S.A., na cidade de Belo Jardim – PE entre Julho/2019 e Janeiro/2020. O estágio foi realizado no setor de Produção da Unidade 10, com enfoque nas Linhas de Montagem de baterias automotivas de médio e grande porte. Sob a orientação do Chefe da Produção, Josair Ricarte, foram executadas atividades relacionadas ao aumento de produtividade e redução no desperdício da Linha 1 de Montagem da Unidade 10 por meio de projetos e apoio realizando a conexão entre a liderança da fábrica e os grupos autônomos que compõem a montagem, além disso foi de responsabilidade do aluno o acompanhamento e realização de todo o processo de comissionamento da Linha 2 de Montagem, a linha de produção com maior grau de automação e tecnologia de toda a Acumuladores Moura S.A. Além das atividades realizadas na Montagem, foi realizada a capacitação do aluno em métodos de análise e solução de problemas, ambientação com o modelo de gestão da produção WCM (World Class Manufacturing), Noções de Segurança do Trabalho, Engenharia de Processos, Gestão de Projetos e Planejamentos Estratégicos da Unidade e Linhas de Produção a curto, médio e longo prazo. Desse modo, foi possível obter experiência prática em Engenharia, item indispensável à formação do profissional em Engenharia Elétrica.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentCentro de Engenharia Elétrica e Informática - CEEIpt_BR
dc.publisher.initialsUFCGpt_BR
dc.subject.cnpqEngenharia Elétrica.pt_BR
dc.titleAtividades desenvolvidas durante o estágio integrado na Acumuladores Moura S.A.pt_BR
dc.date.issued2020-02
dc.description.abstractThis report refers to the integrated internship accomplished by the student Cícero Rômulo Campos de Amorim Filho, at Acumuladores Moura S.A., in the city of Belo Jardim – PE between July/2019 and January/2020. The internship was accomplished in the production sector of Unit 10, with a focus on Assembly Lines of medium and large automotive batteries. Under the guidance of the Head of Production, Josair Ricarte, the accomplished activities related to increasing productivity and reducing waste on Assembly Line 1 of Unit 10 were made through projects and support, making the connection between the leadership of the factory and the autonomous groups that make up the assembly and the student was responsible for monitoring and carrying out the entire commissioning process of Assembly Line 2, the production line with the highest degree of automation and technology in all of Acumuladores Moura SA. In addition to the activities carried out in the Assembly, the student was trained in methods of analysis and problem solving, setting with the production management model WCM (World Class Manufacturing), Notions of Work Safety, Process Engineering, Project Management and Strategic Planning of the Unit and Production Lines in the short, medium and long term. In this way, it was possible to obtain practical experience in Engineering, an indispensable item for the training of professionals in Electrical Engineering.pt_BR
dc.identifier.urihttp://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20916
dc.date.accessioned2021-08-30T19:25:06Z
dc.date.available2021-08-30
dc.date.available2021-08-30T19:25:06Z
dc.typeTrabalho de Conclusão de Cursopt_BR
dc.subjectEstágio em Engenharia Elétricapt_BR
dc.subjectAcumuladores Moura S.A.pt_BR
dc.subjectLinhas de montagempt_BR
dc.subjectBaterias automotivaspt_BR
dc.subjectRedução de desperdíciospt_BR
dc.subjectAumento de produtividadept_BR
dc.subjectInternship in Electrical Engineeringpt_BR
dc.subjectAccumulators Moura S.A.pt_BR
dc.subjectAssembly linespt_BR
dc.subjectAutomotive Batteriespt_BR
dc.subjectWaste reductionpt_BR
dc.subjectProductivity increasept_BR
dc.rightsAcesso Abertopt_BR
dc.creatorAMORIM FILHO, Cícero Rômulo Campos de.
dc.publisherUniversidade Federal de Campina Grandept_BR
dc.languageporpt_BR
dc.title.alternativeActivities developed during the integrated internship at Acumulators Moura S.A.pt_BR
dc.identifier.citationAMORIM FILHO, Cícero Rômulo Campos de. Atividades desenvolvidas durante o estágio integrado na Acumuladores Moura S.A. 2020. 32f. (Relatório de Estágio Integrado) Curso de Bacharelado em Engenharia Elétrica, Centro de Engenharia Elétrica e Informática, Universidade Federal de Campina Grande - Paraíba - Brasil, 2020. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/20916pt_BR
Appears in Collections:Curso de Bacharelado em Engenharia Elétrica - CEEI - Relatórios de Estágio

Files in This Item:
File Description SizeFormat 
CÍCERO RÔMULO CAMPOS DE AMORIM FILHO - RELATÓRIO DE ESTÁGIO ENG. ELÉTRICA 2020.pdfCícero Rômulo Campos de Amorim Filho - Relatório de Estágio Eng. Elétrica 2020.583.53 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.