Please use this identifier to cite or link to this item:
http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/12793
Title: | Análise do conflito de uso da água no perímetro irrigado de Sumé / PB utilizando o modelo GMCR. |
Other Titles: | Analysis of the conflict of water use in the irrigated perimeter of Sumé / PB using the GMCR model. |
???metadata.dc.creator???: | PESSOA, Maria Elvira Borges Tunú. |
???metadata.dc.contributor.advisor1???: | SCHRAMM, Vanessa Batista. |
???metadata.dc.contributor.referee1???: | SANTOS, Joelma Sales dos. |
???metadata.dc.contributor.referee2???: | ALENCAR, Maria Leide Silva de. |
Keywords: | Gestão ambiental;Resolução de conflitos;Decisão em grupo;Conflito de uso da água;Uso da água – conflitos;Perímetro Irrigado de Sumé;Bacia do Rio Sucuru;Departamento Nacional de Obras Contra as Secas – DNOCS;Agência Nacional de Águas;Modelo dos Grafos para Resolução de Conflitos – DMCR;Companhia de Água e Esgotos da Paraíba - CAGEPA;Conflito ambiental;Environmental management;Conflict resolution;Group decision;Water use conflict;Water use - conflicts;Sumé Irrigated Perimeter;Sucuru River Basin;National Department of Works Against Drought - DNOCS;National Water Agency;Model of Graphs for Conflict Resolution - DMCR;Paraíba Water and Sewerage Company;Environmental conflict |
Issue Date: | 10-Dec-2019 |
Publisher: | Universidade Federal de Campina Grande |
Citation: | PESSOA, Maria Elvira Borges Tunú. Análise do conflito de uso da água no perímetro irrigado de Sumé / PB utilizando o modelo GMCR. 2019. 46f. (Trabalho de Conclusão de Curso – Monografia), Curso de Engenharia de Produção, Centro de Desenvolvimento Sustentável do Semiárido, Universidade Federal de Campina Grande, Sumé – Paraíba – Brasil, 2019. Disponível em: http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/12793 |
???metadata.dc.description.resumo???: | Neste trabalho, foi desenvolvida uma metodologia para apoiar a estrutura do Modelo dos Grafos para Resolução de Conflitos (GMCR), a metodologia proposta foi dividida em cinco etapas tendo início com a coleta de dados preliminares sobre o conflito, que ajuda na identificação dos principais atores, suas preferências, estados possíveis e finalizando com uma etapa de análise. Posteriormente o modelo foi utilizado para analisar um conflito relacionado a gestão dos recursos hídricos na bacia do Rio Sucuru, no semiárido brasileiro. A utilização da metodologia proposta proporcionou uma descrição do conflito bem estruturada, robusta e imparcial, o que facilitou a modelagem do problema. O conflito envolve quatro tomadores de decisão (Produtores rurais, Departamento Nacional de Obras Contra as Secas, Governo Federal/ Agência Nacional de Água e Companhia de Água e Esgotos da Paraíba e oitenta e quatro estados viáveis foram obtidos. Com base nas preferências dos tomadores de decisão, quatro etapas foram consideradas de equilíbrio, de acordo com diferentes tipos de critérios de estabilidade. No entanto, a análise dessas soluções indicou que uma delas deveria ser adotada. Nesta solução, o conflito sai do status quo e indica que a solução mais provável seria a realização da obra de restauração do PIS e a limpeza das margens do Rio Sucuru. |
Abstract: | In this paper, a methodology was developed to support the structure of the Graph Model to Conflict Resolution (GMCR), the proposed methodology was divided into five steps starting with the collection of preliminary conflict data, which helps in identifying the main decision makers, their preferences, possible states and ending with an analysis step.Subsequently, the model was used to analyze a conflict related to water resources management in the Sucuru River basin in the Brazilian semiarid. The use of the proposed methodology provided a well structured, robust and unbiased description of the conflict, which facilitated the modeling of the problem.The conflict involves four decision makers (Rural producers, National Department of Drought Works, Federal Government / National Water Agency and Paraíba Water and Sewage Company) and eighty-four viable states were obtained. Based on the preferences of the decision makers, four steps were considered equilibrium according to different types of stability criteria.However, analysis of these solutions indicated that one of them should be adopted. In this solution, the conflict emerges from the status quo and indicates that the most likely solution would be to carry out the PIS restoration work and clear the banks of the Sucuru River. |
Keywords: | Gestão ambiental Resolução de conflitos Decisão em grupo Conflito de uso da água Uso da água – conflitos Perímetro Irrigado de Sumé Bacia do Rio Sucuru Departamento Nacional de Obras Contra as Secas – DNOCS Agência Nacional de Águas Modelo dos Grafos para Resolução de Conflitos – DMCR Companhia de Água e Esgotos da Paraíba - CAGEPA Conflito ambiental Environmental management Conflict resolution Group decision Water use conflict Water use - conflicts Sumé Irrigated Perimeter Sucuru River Basin National Department of Works Against Drought - DNOCS National Water Agency Model of Graphs for Conflict Resolution - DMCR Paraíba Water and Sewerage Company Environmental conflict |
URI: | http://dspace.sti.ufcg.edu.br:8080/jspui/handle/riufcg/12793 |
Appears in Collections: | Livros, E-books, Cartilhas, Relatórios Técnicos e Outros sobre Sumé - PB - CDSA Curso de Bacharelado em Engenharia de Produção - CDSA - Monografias |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MARIA ELVIRA BORGES TUNÚ PESSOA - TCC ENG. DE PRODUÇÃO CDSA 2019.pdf | Maria Elvira Borges Tunú Pessoa - TCC Engenharia de Produção CDSA 2019. | 1.23 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.